 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| • |
New
tiles were “slow” to get on-line
|
|
|
|
– |
They
took up to 5-7 seconds at times
|
|
|
|
– |
We
wanted them to be instant
|
|
|
| • |
The
slaves were all working too hard
|
|
|
| • |
We
should have only sent data to the slaves
|
|
|
|
that
they actually needed
|
|
|
| • |
Queries
running on the master (the approval
|
|
|
process)
were slow and CPU bound
|
|
|
| • |
Slaves
suffered as a result
|
|